Friday, March 24, 2017

it-gh 170324


after the prices of the materials and motor was checked from the market I prepared estimate for Okubi Hotel... and was given to Rita....yet to be given work proceedings...

Estimate made for automation and purchase for a new pump


it-gh 170323


Okubi hotel fault tracing continues the day March 23, 2017
Sulley and I had to pull out the pump from underground to detect that the pump was faulty
After analysis and test with resistance, it was detected that the pump was burnt and needs to be replaced.

pump removed from 50m deep borehole



it-gh 170320


Fault tracing at Okubi...
Borehole pump not working....
Checked power....
Pump need to be removed n checked as well...



The old motor control box and burnt cable

it-gh 170324

after the prices of the materials and motor was checked from the market I prepared estimate for Okubi Hotel... and was given to Rita....yet...